top of page

Self-Stressing Jumbo Tee

Precast, prestressed concrete is a highly engineered, complex product that requires a precision-fabricated, high-quality, durable formwork.

That’s why, when The Shockey Precast Group needed to cast a unique double tee product, they called on Hamilton Form Company.

The “Jumbo Tee” has sixty inch stems with a highly stressed bulb configuration at the stem bottoms. Hamilton Form built the self-stressing formwork in sections for both shipping and stripping considerations. The stems have minimal draft requiring the sideforms to be pull back for stripping. The 118-foot long, twelve foot wide product is casting efficiently and strips easily, keeping productivity high and delivery on time.

SSS-Video-Frame.jpg

Projects

Customer Comments

STAY CURRENT WITH HAMILTON FORM

Enter your email address to receive notification of new products.

By submitting your information, you're giving us permission to email you. You may unsubscribe at any time.

Thank you for subscribing!

  • Youtube
  • LinkedIn
  • Instagram
bottom of page